Current status of the project

Tuesday, 30 January 2018 00:00
(0 votes)
Written by 

It is a newly constructed factory, it is an industrial complex hosting an administrative or office bloc, factory go downs and various ancillary building.  The necessary plant and machinery items have been installed and operations are running and the project is operational.

The buildings are variously built as follows:
The Factory which comprises:

 

  • Large manufacturing area, office and storage areas;
  • Reception area;
  • Store/ office block;
  • Archive room;
  • Stores;
  • Production unit: it is located adjacent to the main store’s block. It provides an area for manufacturing mattresses including mixing machines area, rebinding and cutting machines areas;
  • Edging and sewing house: it is located below the production block, it offers an open room for tape edging and sewing machines;
  • Showroom/ sales house block;
  • Sales office: It is a single storey building which is currently used sd sales offer’s and camera control room;
  • Quitting house: It is a single storey building where the quilting machine is installed;
  • Ablution block;
  • Food store;
  • Generator house;
  • Under ground water tank.

 

share this item
facebook googleplus linkedin rss twitter youtube
item hits
Read 5392 times
Last modified on
Tuesday, 30 January 2018 12:59
Related items

comments

showing 118 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.